九九热线精品在线,九九热精品国产,久久九九热re6这里有精品,九九热线有精品视频96,伊人久久九九热综合网,九九热在线观看密牙,九九 扒开小泬疯狂做爰xxxⅹ_星空麻花mv高清_www.17c草_情头+情侣+双人_亚洲+久+码_潘金莲+在线看_白丝+护士+调教_18+老司机_斯巴达克斯

News

Home > News > Company News

Huanding's self-developed tractor successfully transported perforation guns in Southwest oil and gas fields

Source:Huanding Energy Services    Time:2024/11/8 15:09:55    Views:943

Recently,Huanding's self-developed tractor successfully transported perforation guns in Southwest oil and gas fields.

The construction information is as follows:

YS*****-2 well summary of tractor conveying perforating guns


BASIC BACKGROUND

1. Involved Companies

Wireline providerchina petrol group logging company southwest perforation branch

Tractor serviceHuanding Energy Services

Operation crewC3716

2. Well Condition

Well  nameYS**

Locationtaikang village, yingshan county, luzhou city, sichuan province

Well type production

Well fluidwater

Well depth3540 meter

Casing programme140mm*3540m

Max inclination87.23°

Kick off point1500m

TD temp80℃

3. Logging Programme

Interval0-3540m

Job typeperforation

4. Tools

Wireline loggingCPL perf string

Conveyance toolSTRACTOR tractor

Operation recording

1complete tool stringtop adaptor+swivel sub+mono-to-multiple converter+CCL+tractor electronicEC1701-1+centralizerHD1701-1-2+hydraulic controlling sectionEBS1701-1+driving wheel module No.1DS1701-1-1+driving wheel module No.2 DS1701-1-2+driving module No.3DS1701-1-3+pressure compensation subCS1701+voltage prevent module+ flex sub+mechanical shock absorber+bottom crossover

Specification

Total length12.5m

Max OD80mm

Max tension4T

Max compression4T

Max pressure140MPa

2) Operation procedure

The well depth 3540m,kick off point 1500m,max inclination 87.23°,according to requirement of client, tractor shall convey whole perforating string to TD, then firing five timesestimated tractoring interval is 1500m.

2024-11-4 date crew arrives well at 16:30,

11:16 am run in hole,

14:00 pm stops at 1921mstart tractor;

17:49 pm reaches 3490mswitch to perforation mode

18:00 pm first firing,18:50 final firing

Tractor recording

Time

14:00

16:05

17:01

17:49

Depth

1921m

2747m

3165m

3490m

Applied tool pressure

6.5MPa

6.5MPa

7MPa

7MPa

Wheel rotation

3240ss

3240ss

3240ss

2200ss

Applied voltage

480V DC

480V DC

480V DC

480V DC

Applied current

1.0-1.2A

0.7-0.9A

1.4-1.6A

2.3A